Prepared for: ETHAN LIPP
Project Address: 98 MEETEETSEE MEADOWS, RED LODGE
Project Scope:
Supply and install a complete pre-finished steel wall panel system per approved elevations. Panels are custom cut to match the building geometry, reducing waste and improving the finished appearance.
Materials
26-Gauge PBR steel wall panels
Sherwin SMP finish – Burnished Slate
Custom cut-to-length panels for all wall sections
Color-matched trim:
Base trim
Outside corners
Fascia / F&J trim
Non-vented soffit
Color-matched fasteners
Heavier-gauge steel is specified to reduce oil-canning and provide superior rigidity on tall wall sections.
Installation
Professional installation by experienced crews
Layout per approved elevations
Proper fastening and trim integration
Jobsite cleanup included
Why This System
26-gauge steel for improved rigidity
Cut-to-length panels reduce waste
Properly scoped — no shortcuts
Designed for long-term durability